Testimonials


Committed to delivering exceptional service and promoting an incident- and injury-free workplace, Monford has a strong track record of delivering services to major projects safely and sustainably, on time and on budget. Here’s what some of our clients have said.

“Monford completed various packages of work for the WA Gateway Project, including a reinforced concrete stormwater detention tank (3000m3 capacity), a 140m reinforced concrete retaining wall, bored piling and detailed earthworks. All work was completed to a very high standard.

Monford’s team was very proactive about safety and quality. It was critical on this project to deliver a high-quality product in a safe working environment. Monford embraced our vision and excelled in this space.

Monford was subsequently awarded the contract for the form, reo and pour packages for both the superstructure and substructure of the Abernethy/Leach Intersection Bridge. This demonstrates our confidence in Monford to deliver one of the standout elements of infrastructure on the Gateway Project.”

Feargal O’Hara
Senior Project Engineer (Structures, West Zone)
Gateway WA

“Monford performed extensive concrete and reinforcement works packages on the Balannup Pumping Station Project. As one of only four Type 350 pumping stations in WA, this unique project involved sinking a 12.5 metre diameter shaft 16 metres below ground, using grout mix piling as temporary works to facilitate the safe construction of the pumping station and associated infrastructure works.

Monford’s extensive experience in shaft construction was an invaluable asset to the project. Its team’s can-do attitude and thorough approach to safety, combined with its innovative construction techniques, resulted in a cost-effective and incident-free project, delivered on time and on budget.

I was particularly impressed with Monford’s knowledge and adaptability when faced with unforeseen engineering obstacles. Monford’s personnel repeatedly demonstrated their skills and professionalism throughout this unique – and technically challenging – project.”

Andrew Houston
Projects Manager
on behalf of Georgiou

“As a subcontractor for John Holland Group in the Pluto LNG Process Buildings Project in Karratha, Western Australia, Monford conducted concrete, formwork installation and general labouring works. Monford’s personnel were very hard working, knowledgeable and employed high safety standards and working practices at all times.”

Juan Valencia
Construction Manager - Pluto LNG Process Buildings Project
John Holland Group Pty Ltd