Project Description

Port Hedland Solar Farm

Port Hedland Solar Farm – WA

Project description

The Port Hedland Solar Farm is a 45MW solar project. It will be constructed and connected to Alinta Energy’s existing Port Hedland power station which is located 14km from the BHP port facilities. The project is expected to be the first large scale renewable facility in Port Hedland and is forecasted to power 100 per cent of the average daytime energy requirements for BHP’s port facilities. The project will span across 100 hectares, with the installation of approximately
100,000 solar panels. It is expected to be operational by late 2024.

Scope of work 

As EPC Contractor, Monford Group’s scope of works include:

  • Engineering
  • Procurement
  • Construction
  • Commissioning

Project Details

CLIENT

APA

Project Gallery