Project Description
Roe Highway Duplication – Welshpool, WA
The Roe Highway Project involved the upgrade of a two-kilometre section of Roe Highway from Tonkin Highway to Orrong Road.
Monford Group’s scope of works on the project included the removal of topsoil, pavement, and kerbing. Foundation preparations took place along with embankment construction. The installation of critical substructures such as drainage channels, stormwater treatment systems, and roadway lighting were all conducted efficiently and to a high standard.
Monford Group’s impeccable safety standards were essential to complete works due to the road being constructed alongside live traffic and an operational railway line
Project Details
PRINCIPAL
Main Roads